Ryan hauls rock toTrail 2 where it passes through a draw that will be wet in the Spring. This is a single-track trail.
View Larger
|
The rock was later spread by the Sweco dozer and by hand.
View Larger
|
Ryan dumps 4" minus rock on Trail 12 where it passes through a draw that will be wet in the Spring.
View Larger
|
The middle portions of the hillclimbs were flat enough to allow equipment to rip the trails to allow water percolation. Here a trail has been ripped, seeded, and debris brought in to deter use and disguise the old trail. Check dams and cross ditches were installed at strategic locations.
View Larger
|
The carrier and the loader transport the material. The carrier hauls more material and is more manoeuverable than the loader.
View Larger
|
A rented Bobcat T140 loads our Yanmar carrier with 4-8" minus crushed limestone. This is excellent rock for check dams and stabilization work.