|
|
|
The middle portions of the hillclimbs were flat enough to allow equipment to rip the trails to allow water percolation. Here a trail has been ripped, seeded, and debris brought in to deter use and disguise the old trail. Check dams and cross ditches were installed at strategic locations.
|
|
|